ORDER OF ASSEMBLY

These instructions define the recommended order of construction for the first time builder.

1.    ASSEMBLE THE "DRY DOCK"
2.    INSTALL SHAFT PIPES AND COMPRESSION POST
3.    PREPARE FOR EPOXY OPERATION

4.    EPOXY OPERATION
          ASSEMBLE
BALLAST AND KEEL FIN
          REINFORCE KEEL
          INSTALL THE ELECTRONIC MOUNTING BOARD
5.    FINISHING THE HULL, KEEL AND RUDDER
6.    INSTALL HATCH COVERS
7.    INSTALL RADIO COMPONENTS
8.    INSTALL DECK PARTS
9.    MAST CONSTRUCTION
10.  BOOM CONSTRUCTION
11.  STANDING RIGGING

  1. SAILS
  2. RUNNING RIGGING
  3. INSTALL THE RUDDER AND KEEL

  1. Use the two "extra large" screws (longest of the kit screws) for the main pivots of the stand.
  2. Cut the blue nylon strap in half. Seal the ends of the strap by melting with a hot knife heated using a lighter. Alternatively, use CA glue to seal the ends.  If done as shown in the booklet, the end of the strap may ignite.
  3. Use the "mall screws - round head ¼" long" to attach the straps so that the hull does not touch the side bars.
  4. If required when the boat is fully assembled, adjust the straps so that  the keel does not touch the ground.